Silo DeliveryOnce Remix have received confirmation that safe access, a silo base and appropriate power and water provisions have been made by the customer, a silo delivery date will be finalised. The silo will be delivered by a rigid truck, which will reverse up to the silo base to stand the silo on it. Silos are normally delivered with a part load of up to a maximum of 15 tonnes, please check your delivery ticket for the exact tonnage delivered. Remix can also deliver silos empty at the customers request e.g. where access is restricted and the customer is able to place the silo onto the base via a crane. Silo Commission and Demonstration
|
|
|
Ensure power leads and water hoses are correctly and securely connected |
|
|
Place tub under discharge chute |
|
|
Press start button on control panel to run mixer before opening manual butterfly valve |
|
|
Open butterfly valve to allow material into the dry chamber, which will then be fed into the wet chamber where water addition takes place |
|
|
Adjust workability of mortar as required by using the water flow control valve. |
|
|
When the amount of mortar being discharged into the tub is nearing the required amount, close the butterfly valve and keep the mixer running. The remaining mortar inside the unit will then discharged into the tub. When all of the mortar has been run out of the discharge point and only water is left running from it, you will know that the mixer is clean and you can press the stop button. |
|